消息称老熟妇乱视频一区二区,99久久无码一区人妻A黑,好吊视频一区二区三区,久久久久人妻精品一区三寸蜜桃

產(chǎn)品banner
Your current location: Index >> Products >> Drum line

Drum line steering

Drum line steering
Detailed:

The reasonable layout of the drum line has an important influence on the efficiency and production cost of the production line. The following will be from the principle of production line layout, the process layout of drum line and equipment layout to explore the reasonable layout of drum line production line.



First, the principle of production line layout

Reasonable production line layout should follow the following principles:


1. Removal of bottleneck processes: The layout of the production line should consider the interdependence between processes, and eliminate or reduce the bottleneck processes between processes to improve the production line's productivity and efficiency.


2. Shorten the flow path of materials: the shorter the flow path of materials on the production line, the higher the production efficiency. Therefore, the layout should shorten the flow path of the material as much as possible and reduce the handling and waiting time of the material.


3. Improve the utilization rate of equipment: The layout of the production line should maximize the utilization rate of equipment, avoid redundancy and vacancy between equipment, and improve the efficiency and economy of the production line.


4. Ensure safety and comfort: The layout should consider the safety and comfort of the operator to avoid accidents and quality problems caused by excessive fatigue of the operator.



Second, the process layout of the drum line

The process layout of drum production line usually includes raw material preparation, processing and assembly. The following is a reasonable process layout of the drum line:


1. Raw material preparation: Set up a raw material preparation area at the starting point of the production line, and place the required raw materials and accessories in a certain order to facilitate the access of subsequent processes.


2. Processing process: the processing process of the drum line is divided into several steps, each step sets up a station, and puts the corresponding equipment on each station so that the operator can carry out the corresponding processing work.


3. Assembly process: the assembly process of the drum line is divided into several steps, each step sets up a station, and puts the corresponding assembly equipment on each station to facilitate the operator to assemble the drum line.



Third, equipment layout

The equipment layout of the drum line should meet the following requirements as far as possible:


1. The distance between the equipment should be as short as possible to reduce the flow path of the material and the walking time of the operator.


2. Relevant equipment should be as close as possible so that the operator can complete the process at one stop.


3. Sufficient space should be reserved between the equipment to facilitate the operation and maintenance of the equipment.


4. The flow direction of the material should be clearly visible to facilitate the operator to grasp the flow of the material.



In summary, the production line of the reasonable layout of the drum line should follow the principle of the production line layout, and the process layout and equipment layout of the drum line should be rationally arranged to improve the efficiency and economy of the production line. At the same time, the layout design should consider the safety and comfort of the operator, improve productivity while also realizing the work potential of employees. Through the scientific and reasonable layout, the drum line production line can achieve high efficiency and high quality production.


Previous:Drum line maintenance2023-07-29
Next:Drum line running2023-07-29

Recently Viewed:

桁架機(jī)械手

Hotline:

機(jī)器人系統(tǒng)集成

No. 3, Guangda Road, Zhitang Industrial Park, Changshu City

国产一二三四2021精字窝| 国产成人午夜高潮毛片| 中文字幕精品亚洲无线码一区应用| 日韩精品久久久久久免费| 一区二区国产好的精华液SUV| 国产精品爽爽VA在线观看网站|